Index
I
| Impossible turn | 18-7 |
| Inadvertent flight into IMC | 5-1, 5-2, 5-3, 5-26, 18-17 |
| Attitude control | 3-5, 18-17, 18-18 |
| Climbs | 18-20 |
| Combined maneuvers | 18-21 |
| Descents | 18-20 |
| Maintaining airplane control | 18-18 |
| Recognition | 18-17 |
| Transition to visual flight | 18-22 |
| Turns | 18-19 |
| In-flight fire | 15-14, 18-9 |
| Initial climb | 6-1, 6-5, 6-6, 6-8, 6-10, 6-11, 6-12, 6-13, 6-14, 12-16, 13-15, 13-16, 13-17, 13-29, 14-4, 15-2, 15-15, 16-2, 16-17, |
| Inside the airplane | 2-21, 6-12, 17-9 |
| Instrumentation | 3-3, 3-5, 5-2, 5-4, 11-4, 17-7, 18-15, 18-23 |
| Integrated flight instruction | 3-5, 3-6 |
| Intentional slips | 9-12 |
| Intentional spins | 5-25, 5-26 |
| Interstage turbine temperature (ITT) | 15-4, 15-5, 15-8 |
| Irreversible deceleration and/or sink rate | 4-1, 4-5, 4-11, 4-14, 4-17, 4-19 |
J
| Jet airplane approach and landing | 16-17, 16-18, 16-19, 16-20, 16-21, 16-22, 16-23, 16-24 |
| Approach speed | 16-22 |
| Glidepath control | 16-22 |
| Landing requirements | 16-19 |
| Landing speeds | 16-20 |
| Approach climb | 16-20 |
| Landing climb | 16-20 |
| V | 16-20 |
| V | 16-20 |
| Stabilized approach | 16-21 |
| The flare | 16-23 |
| Touchdown and rollout | 16-24 |
| Jet engine basics | 16-1 |
| Jet engine efficiency | 16-4 |
| Jet engine ignition | 16-1 |
K
| Kinetic energy | 4-1, 4-7, 4-9, 4-18, 4-19, 16-10, 16-18, 16-19 |
L
| Landing | 9-2 |
| Landing gear | 2-10, 14-1 |
| Instability | 14-1 |
| Landing gear control selected up, single-engine climb | 13-31 |
| performance adequate | |
| Checklist | 13-32 |
| Climb | 13-32 |
| Configuration | 13-31 |
| Control | 13-31 |
| Landing gear selected up, singe-engine climb performance | 13-30 |
| inadequate | |
| Landing gear down | 2-5, 13-16, 13-30 |
| Late or rapid round out | 9-31 |
| Lazy eight | 10-6, 10-7 |
| Level-off and cruise | 3-20, 12-8 |
| Level turns | 3-11 |
| Establishing a turn | 3-15 |
| Medium turns | 3-12 |
| Shallow turns | 3-12 |
| Steep turns | 3-12 |
| Turn radius | 3-14 |
| Liftoff | 6-4 |
| Rotation | 6-5 |
| Light sport airplane (LSA) background | 17-1 |
| Loss of control in-flight (LOC-I) | 4-1, 4-19, 5-1, 5-2, 5-3, 5-4, 5-5, 5-6, 5-27 |
| Low final approach | 9-30 |
| Low speed flight | 12-1, 16-6 |
| LSA maintenance | 17-4, 17-5 |
| LSA synopsis | 17-3 |
M
| Mach buffet boundaries | 16-6 |
| Manuevering by reference to ground objects | 7-1 |
| Minimum equipment list and configuration deviation list | 16-24, 16-25 |
| Multiengine training considerations | 13-35 |
N
| Night illusions | 11-4 |
| Black-hole approach | 11-5 |
| Visual autokinesis | 11-4 |
| Night vision | 11-1 |
| Noise abatement | 16-14 |
| Normal and crosswind takeoff and climb | 13-15, 17-4 |
| Normal approach and landing | 9-2, 13-20 |
| After-landing roll | 9-9 |
| Base leg | 9-2 |
| Final approach | 9-3 |
| Estimating height and movement | 9-7 |
| Use of flaps | 9-1 |
| Round out (flare) | 9-8 |
| Stabilized approach concept | 9-4 |
| Touchdown | 9-9 |
| Wrong surface landing avoidance | 9-4 |
| Normal takeoff | 6-3 |
| Intitial climb | 6-5 |
| Lift-off | 6-4 |
| Takeoff roll | 6-3 |
| Nose baggage compartment | 13-9 |
O
| Operating the jet engine | 16-2 |
| Operational considerations | 15-11 |
| Operation of systems | 17-4, 13-3 |
| Orientation and navigation | 11-9 |
| Outer wing surfaces | 2-6 |
| Outside of the airplane | 2-21, 18-18 |
P
| Parking | 2-18, 7-23, 11-8, 16-1, 17-4 |
| Performance and limitations | 13-10, 17-4 |
| Pilot equipment | 11-5 |
| Pilot sensations in jet flying | 16-11 |
| Pitch and power | 9-2, 9-3, 9-4, 9-20, 11-10, 12-4, 17-14 |
| Pitch contol | 3-2, 3-5, 3-17, 3-23, 3-24, 5-10, 5-21, 10-2, 10-3, 10-4, 13-32, 16-12, 16-24, 18-9, 18-11, 18-18 |
| Plain (hinge) flap | 12-3 |
| Porpoising | 9-34, 9-35, 18-13 |
| Post-flight | 2-23, 17-15 |
| Securing and servicing | 2-23 |
| Potential energy | 4-1, 4-10, 4-18, 4-19, 16-18, 16-19 |
| Power available | 4-5, 4-14, 4-15, 4-16, 4-17, 4-18, 4-19, 13-3, 13-19, 13-29, 13-34, 16-20, 18-4 |
| Power control | 3-5, 4-6, 12-10, 16-2 |
| Power-off accuracy approaches | 9-24 |
| 90° Power-off approach | 9-25, 9-26, 9-27 |
| 180° Power-off approach | 9-25, 9-26 |
| Power required | 4-5, 4-6, 4-15, 4-16, 4-18, 9-11, 13-3, 16-7, 16-11 |
| Preflight | 17-9 |
| Preflight assessment of the aircraft | 2-1 |
| Preparation and preflight | 11-7 |
| Pre-takeoff procedures | 2-21, 6-1, 13-12, 13-15 |
| Prior to takeoff | 6-1 |
| Propellers | 3-19, 12-5, 12-7, 12-8, 13-3, 13-5, 13-6, 13-7 |
| Propeller snychronization | 13-7 |