Index
Symbols
| Entry | Pages |
|---|---|
| 3-cord cotton thread–waxed | 6-10 |
| 6-inch adjustable wrench | 6-10 |
| 6-inch stainless steel rule | 6-4 |
| 14 CFR part 1—definitions | 1-8 |
| 14 CFR part 21 subpart O—Technical Standard Orders (TSO) | 1-8 |
| 14 CFR part 91—General Operating and Flight Rules | 1-9 |
| 14 CFR part 105 subpart C—Parachute Equipment and Packing | 1-9 |
A
| Entry | Pages |
|---|---|
| Accessory components | 7-65 |
| Acid contamination | 7-10 |
| ↳ Action | 7-10 |
| Airing and drying | 5-13 |
| Alterations | 7-73 |
| Approved data | 7-11 |
| Articulated harness main lift web (MLW) resizing | 7-73 |
| Articulated upper leg hardware replacement | 7-56 |
| Assemble and pack (A&P) | 1-7 |
| Assembling the reserve system | 5-28 |
| ↳ Step 1. Layout and setting up packing clamps | 5-29 |
| ↳ Step 2. Stacking and pleating the reserve canopy | 5-29 |
| ↳ Step 3. Setting the brakes | 5-31 |
| ↳ Step 4. Folding the canopy | 5-32 |
| ↳ Step 5. Placing the canopy into the deployment bag and stowing the lines | 5-33 |
| ↳ Step 6. Placing the bag into the container and closing the container | 5-35 |
| Assembly of components and compatibility | 4-13 |
| Assembly of the main canopy to the harness and container | 4-11 |
| ↳ 3-ring release handle | 4-13 |
| ↳ Harness 3-ring attachment | 4-12 |
| ↳ Main riser rings | 4-13 |
| ↳ Release housings | 4-13 |
| Automatic activation devices | 2-18 |
| Automatic activation device (AAD) installation | 7-77 |
| ↳ Adhesive channel installation | 7-78 |
| ↳ Built-in channel modification configuration | 7-78 |
| ↳ Cutter channel and elastic installation | 7-79 |
B
| Entry | Pages |
|---|---|
| Beeswax | 6-12 |
| Bias construction | 2-6 |
| Binding tool | 6-13 |
| Block construction | 2-6 |
| Bottom of container (BOC) pocket | 7-85 |
| Bottom of container (BOC) pocket replacement | 7-48 |
| Bridle | 2-15 |
| ↳ Pre-sewn bridle | 2-15 |
| ↳ Square reserve bridles | 2-15 |
| ↳ Tubular nylon bridle | 2-15 |
| Bridle and deployment devices | 2-11 |
| Bridle length | 4-10 |
| Butane cigarette lighter | 6-4 |
C
| Entry | Pages |
|---|---|
| Cable cutters | 6-11 |
| Canopy and lines | 7-13 |
| Canopy assembly and line continuity | 5-14 |
| Canopy design | 2-5 |
| Canopy ripstop tape repair | 7-16 |
| Center cell top skin | 7-7 |
| Certification specifications | 1-9 |
| Chest strap replacement | 7-51 |
| Cleaning and washing procedures | 7-89 |
| Cleaning the parachute | 7-11 |
| ↳ Hand washing (if absolutely necessary) | 7-11 |
| Closing plate | 6-6 |
| Collapsible pilot chute/bridle system | 2-16 |
| ↳ Bungee collapsible configuration | 2-16 |
| ↳ Kill-line collapsible configuration | 2-16 |
| Colorfastness | 7-89 |
| Component compatibility | 5-4 |
| Component parts | 2-2 |
| Compound feed machine | 6-20 |
| Configuration | 2-7 |
| Connector link separator tool | 6-7 |
| Consew 206RB | 6-16 |
| Construction concepts and techniques | 2-5 |
| Container | 2-6, 5-12, 5-17, 7-38 |
| Container fabric panel repair | 7-38 |
| ↳ Binding tape repair or splice | 7-39 |
| ↳ Hidden patches | 7-40 |
| ↳ Overlay patches | 7-40 |
| ↳ Single-side fabric patches | 7-41 |
| Container grommet replacement | 7-42 |
| Container plastic stiffener replacement | 7-44 |
| Container Velcro® replacement | 7-43 |
| Contamination conditions | 7-8 |
| Continuous line method | 7-34 |
| Cords, lines, and threads | 3-8 |
| Currency requirements | 1-6 |
| Cutting pad | 6-13 |
D
| Entry | Pages |
|---|---|
| Damage | 2-6 |
| Damage identification | 5-8 |
| Deployment and inflation characteristics | 4-8 |
| Deployment type | 2-12, 4-16 |
| ↳ Type 1: Canopy first deployment | 2-12 |
| ↳ Type 2: Two-stow diaper or half diaper | 2-12 |
| ↳ Type 3: Ascuitto or piglet-style flat diaper | 2-13 |
| ↳ Type 4: Handbury or preserve full diaper | 2-13 |
| ↳ Type 5: Free bag | 2-13 |
| ↳ Type 6: Sleeves | 2-13 |
| Designated Parachute Rigger Examiner (DPRE) | 1-3 |
| Detailed information on square canopy repairs | 7-14 |
| Documentation | 5-39 |
| Drop feed machine | 6-19 |
| Drying a parachute | 7-11 |
E
| Entry | Pages |
|---|---|
| Earning a Parachute Rigger Certificate | 1-2 |
| ↳ Alternate means of qualifying for a Parachute Rigger Certificate | 1-3 |
| ↳ Retesting | 1-3 |
| ↳ Testing | 1-3 |
| Emergency parachute canopy | 2-2 |
F
| Entry | Pages |
|---|---|
| Fabric marking pencils and felt tip markers | 6-4 |
| Fabrics | 3-2, 7-6 |
| Facilities and tools | 1-5 |
| Fasteners | 3-21 |
| Finger-trapping needle | 6-4 |
| Finger-trapping wire | 6-5 |
| Flat packing | 4-2 |
G
| Entry | Pages |
|---|---|
| Grommet protectors | 7-5 |
H
| Entry | Pages |
|---|---|
| Hand deploy pilot chutes | 2-17 |
| ↳ Pull-out pilot chute (POP) configuration | 2-18 |
| ↳ Throw-out pilot chute (TOP) configuration | 2-17 |
| Hand tacking needles | 6-9 |
| Hand tacking techniques | 7-86 |
| Hand tools | 6-2 |
| Hardware | 3-12 |
| Harness | 5-11, 5-17 |
| Harness and risers | 7-51 |
| Harness/container | 2-2 |
| ↳ Deployment devices for the main and reserve parachutes | 2-3 |
| ↳ Main parachute release mechanism and associated handles or static lines | 2-3 |
| ↳ Other harness/container assembly components | 2-4 |
| ↳ Pilot chutes and bridles for the main and reserve parachutes | 2-2 |
| ↳ Ripcords or equivalent devices for the main and reserve parachutes | 2-3 |
| ↳ Risers and associated steering toggles | 2-3 |
| Harness design | 2-9 |
| Harness strength | 4-14 |
| Hemostats or clamp | 6-2 |
| High-density polyethylene (HDPE) | 3-20 |
| Hole punches | 6-13 |
| Hot glue gun | 6-12 |
| Hot knife element with cutting tip, basting tip, and stand | 6-12 |
| Housings | 3-22 |
| ↳ Push-pull system | 3-24 |
I
| Entry | Pages |
|---|---|
| Identification | 5-2 |
| Identification and nomenclature | 6-16 |
| Minor repair | 7-8 |
| Inspect and repack (I&R) | 1-7 |
| Inspection | 5-2, 5-16 |
| Inspection process | 7-2 |
| Installing the needle and threading the machine | 6-21 |